Slipform.jpg

Subiaco WWTP - Perth, WA

Main Contractor: Guidera O’Connor

We were engaged by GOC to work on the upgrade of Water Corp’s Water Treatment Plant in Subiaco. We completed the detailed earthworks, formwork, reo and the pour and installation of underground services.  

  • Formwork and steel fixing

  • Concrete supply and install of complex circular tank with Launder channel 

  • Bulk Earthworks including managing contaminated soils 

  • Installation of underground conduits and cables 

  • Detailed earthworks  


Shenton Park Pump Test Facility - Perth, WA

Main Contractor:  Valmec 

Valmec engaged CATS to construct a waterproof tank including form, reo and pour at Shenton Park Pump Test Facility. 

  • Formwork and steel fixing

  • Concrete supply and install of construct rectangular waterproof tank and cover slab 

  • Labour and plant hire 


IMG_1837.JPG

Bold Park Reservoir - Perth, WA

Main Contractor:  Valmec 

Repeat client Valmec engaged us to complete pipe encasements, slabs, retaining walls and stairs. This included form, reo and pour at Bold Park Reservoir upgrade. 

  • Formwork and steel fixing

  • Concrete supply and install of encasement of pipes ~ 200m long around 900mm and 600mm diameter pipes at 30% angle uphill 

  • Stairs - FRP 

  • Base Slabs - FRP 

  • Retaining walls – FRP 


IMG_0168.JPG

Bridgetown WWTP – Bridgetown, WA

Main Contractor:  Guidera O’Connor

GOC engaged CATS to complete the detailed earthworks, form, reo and pour at Water Corp upgraded Water Treatment Plant in Bridgetown. The project was completed ahead of schedule and on budget. 

  • Formwork and steel fixing

  • Concrete supply and install 

  • Completed all detailed earthworks 

  • Installation of underground conduits and cables 

  • Plant and equipment supply 

  • Labour and plant hire  


DENMARK - WA.JPG

Denmark Water Treatment Plant – Denmark, WA

Main Contractor:  Guidera O’Connor

We were engaged by GOC to complete the detailed earthworks and placement of 215m3 of concrete at their new Water Treatment Plant in Denmark. We worked closely with the team at GOC to deliver the project within budget and ahead of schedule. 

  • Formwork and concrete supply and install 

  • Completed all detailed earthworks 

  • Steel fixing (reo supply and install)   


ROTTNEST ISLAND.JPG

Rottnest Water Treatment Plant - Rottnest, WA

Main Contractor:  Guidera O’Connor

GOC engaged CATS to complete the extension of two walls for water tanks on the incredible Rottnest Island. 

  • Tank wall extensions 

  • Formworking, steel fixing and concrete placement 

  • Labour and plant hire