Claremont Train Station Upgrade - Perth, WA
Main Contractor: Rhomberg Rail
Rhomberg Rail engaged CATS to construct new mast foundation for the proposed rail alignment.
Pile foundation construction under rail shut on numerous different shuts
Piling machinery to excavate required footing
Concrete pump and material supply to supply reinforced in situ concrete footing with HD bolts
Labour and plant hire (RIW accredited staff)
West Perth Train Station Upgrade - Perth, WA
Main Contractor: RCR O’Donnell Griffin
We were contracted by RCR ODG to complete all civil works for the PTA upgrade in West Perth including the construction of a 4.5 metre curved cavity block wall. We also supplied hiab trucks, utes, tipper trucks, excavators and lighting towers to the project.
Formwork supply and install
Reo supply and install
Installation of underground conduits & cables
Concrete supply and placement
Hire of hiab trucks, utes, lighting towers, tipper trucks and excavators
Skilled crew hire
Perth Stadium - Perth, WA
Main Contractor: EMRAIL/LKS
We were contracted to complete the footings for the new overhead lines of the PTA rail. All footings and pedestals consisted of a square base and circular pedestal and had to be poured in one go. The footings were completed at night as well as during the day. All workers were trained and accredited in WPW05.
Formwork supply and install
Reo supply and install
Concrete supply and placement
Installation of underground conduits and cables
Kenwick Train Station Upgrade - Perth, WA
Main Contractor: LKS Constructions
In line with the PTA upgrade of Kenwick train station, we were contracted to construct all the in situ concrete elements which consist of footings, ramps, stairs and retaining walls. We supplied all concrete, reinforcing and formwork systems to complete the works.
Formwork supply and install
Reo supply and install
Concrete supply and placement
Installation of underground conduits and cables
Denny Avenue (Metronet) - Perth, WA
Main Contractor: Downer
As part of the major Metronet plan, Downer engaged CATS to construct the mast foundations for the new level crossing removal at Denny Avenue in Kelmscott along with the backfilling of the bridge abutments.
Pile foundation construction under rail shut on numerous different shuts
Piling machinery to excavate required footing
Labour & Plant Hire – RIW accredited staff