claremont.jpg

Claremont Train Station Upgrade - Perth, WA

Main Contractor: Rhomberg Rail 

Rhomberg Rail engaged CATS to construct new mast foundation for the proposed rail alignment. 

  • Pile foundation construction under rail shut on numerous different shuts 

  • Piling machinery to excavate required footing 

  • Concrete pump and material supply to supply reinforced in situ concrete footing with HD bolts 

  • Labour and plant hire (RIW accredited staff)


PTA-WestPerth.jpg

West Perth Train Station Upgrade - Perth, WA

Main Contractor: RCR O’Donnell Griffin 

We were contracted by RCR ODG to complete all civil works for the PTA upgrade in West Perth including the construction of a 4.5 metre curved cavity block wall. We also supplied hiab trucks, utes, tipper trucks, excavators and lighting towers to the project. 

  • Formwork supply and install 

  • Reo supply and install 

  • Installation of underground conduits & cables 

  • Concrete supply and placement 

  • Hire of hiab trucks, utes, lighting towers, tipper trucks and excavators 

  • Skilled crew hire 


PTA-PerthStadium.jpg

Perth Stadium - Perth, WA

Main Contractor: EMRAIL/LKS 

We were contracted to complete the footings for the new overhead lines of the PTA rail. All footings and pedestals consisted of a square base and circular pedestal and had to be poured in one go. The footings were completed at night as well as during the day. All workers were trained and accredited in WPW05.

  • Formwork supply and install 

  • Reo supply and install 

  • Concrete supply and placement 

  • Installation of underground conduits and cables 


PTA-Kenwick.jpg

Kenwick Train Station Upgrade - Perth, WA

Main Contractor: LKS Constructions

In line with the PTA upgrade of Kenwick train station, we were contracted to construct all the in situ concrete elements which consist of footings, ramps, stairs and retaining walls. We supplied all concrete, reinforcing and formwork systems to complete the works. 

  • Formwork supply and install 

  • Reo supply and install 

  • Concrete supply and placement 

  • Installation of underground conduits and cables 


Denny Avenue (Metronet) - Perth, WA

Main Contractor: Downer 

As part of the major Metronet plan, Downer engaged CATS to construct the mast foundations for the new level crossing removal at Denny Avenue in Kelmscott along with the backfilling of the bridge abutments.

  • Pile foundation construction under rail shut on numerous different shuts

  • Piling machinery to excavate required footing

  • Labour & Plant Hire – RIW accredited staff